ASHDOWN • S14697-01

06DEC
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

27DEC
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

03JAN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

05JAN
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

05JAN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

10JAN
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

10JAN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

12JAN
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

12JAN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

24JAN
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

26JAN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

07FEB
Electrical
The wiring harness is installed. Emergency and scene lighting are mounted and terminated at the breaker panel.

14FEB
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.


16FEB
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.

21FEB
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.