US FISH & WILDLIFE • S14683-01

19MAY
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

09JUN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

17MAY
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

19MAY
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

24MAY
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

26MAY
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

31MAY
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

07JUN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

09JUN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

14JUN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

16JUN
Fabrication
The frame will be constructed, the compartments are fabricated and the body will be assembled.

21JUN
Electrical
The wiring harness is installed. Emergency and scene lighting are mounted and terminated at the breaker panel.

23JUN
Electrical
The wiring harness is installed. Emergency and scene lighting are mounted and terminated at the breaker panel.

28JUN
Electrical
The wiring harness is installed. Emergency and scene lighting are mounted and terminated at the breaker panel.




















17NOV
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

06DEC
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

13DEC
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

27DEC
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

03JAN
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.

05JAN
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.


19JAN
Chassis Prep
The bumper is replaced, cab consoles are fitted and the suspension upgrade package and tires are installed.


26JAN
Assembly
The body will be mounted to the chassis, final plumbing and electrical connections are made.